Project.............................. Daisy first pitot shot with 80% He Run number........................... x2s3668 Date.................................6/10/2017 Blame................................ Yu Liu, Chris James,Tim Cullen Reservoir............................... 6.0 MPa (gauge) Driver...................................He to 772mbar, flushed once with He to 50mbar Primary diaphragm.................... 2.5 mm cold rolled steel, scored diaphragm Shock tube........................... 2000 Pa 20%H2/80%He in bottle filled 28/09/17 (filled on 100 torr gauge), flushed twice to 2000 Pa with pure He Secondary diaphragm.................. Al Multiex diaphragm (approx 14 microm thick) Acceleration tube.................... 0.5 Pa lab Air (filled on 1 torr gauge) (or as low as we can get) Trig.................................. photodiode into X2 microsec delay box (Tr value set at 40) EXPERIMENT Second Daisy pitot shot. Repeat of the first shot, with Daisy filling everything this time Photodiode trigger Separate function generator to trigger mini spectro: delay 0us freq 50Hz Amp1: 10Vpp Spectrometer: f=50mm lens at approximately 1.2m, aimed at pt5. Unknown lens material. Exposure: 50us Window: Perspex HS: Nikkon AF micro 200mm f/5.6 250kHz 50 pre trigger frames 1/2 frame exposure 1x gain Using Andover corporation H-a filter 656FSX10-50