2024-10-17 19:30:54 +10:00

37 lines
1.3 KiB
Plaintext

Project.............................. Daisy first pitot shot with 80% He
Run number........................... x2s3668
Date.................................6/10/2017
Blame................................ Yu Liu, Chris James,Tim Cullen
Reservoir............................... 6.0 MPa (gauge)
Driver...................................He to 772mbar, flushed once with He to 50mbar
Primary diaphragm.................... 2.5 mm cold rolled steel, scored diaphragm
Shock tube........................... 2000 Pa 20%H2/80%He in bottle filled 28/09/17 (filled on 100 torr gauge), flushed twice to 2000 Pa with pure He
Secondary diaphragm.................. Al Multiex diaphragm (approx 14 microm thick)
Acceleration tube.................... 0.5 Pa lab Air (filled on 1 torr gauge) (or as low as we can get)
Trig.................................. photodiode into X2 microsec delay box (Tr value set at 40)
EXPERIMENT
Second Daisy pitot shot. Repeat of the first shot, with Daisy filling everything this time
Photodiode trigger
Separate function generator to trigger mini spectro:
delay 0us
freq 50Hz
Amp1: 10Vpp
Spectrometer:
f=50mm lens at approximately 1.2m, aimed at pt5. Unknown lens material.
Exposure: 50us
Window: Perspex
HS:
Nikkon AF micro 200mm
f/5.6
250kHz
50 pre trigger frames
1/2 frame exposure
1x gain
Using Andover corporation H-a filter 656FSX10-50